1. Sakhaee, F. and Khalili, F. (2021). "Sediment pattern & rate of bathymetric changes due to construction of breakwater extension at Nowshahr port." Journal of Ocean Engineering and Science 6(1), 70-84. [ DOI:10.1016/j.joes.2020.04.002] 2. Mahmoodi, A., Lashteh Neshaei, M. A., Mansouri, A. and Shafai Bejestan, M. (2020). "Study of Current- and Wave-Induced Sediment Transport in the Nowshahr Port Entrance Channel by Using Numerical Modeling and Field Measurements." Journal of Marine Science and Engineering 8(4), 284. [ DOI:10.3390/jmse8040284] 3. Emami Zadeh Mahabadi, A. M., Lari, K. and Zoljoodi, M. (2018). "Comparing the estimation of sedimentation rate and volume in Imam Khomeini Port's access channel using the methods of Hydrography, Bijker's theory and modeling by Mike21." Geographic Information Journal Sepehr 27(106), 141-152. 4. Enayati, A. and Khalooei Tafti, S. S. (2019). "Evaluation of Semi-Empirical Relationships in Estimating Longshore Sediment Transport Rate Based on Field Data Validation (Babolsar Coast)." Proceedings of the 3rd International Congress on Civil Engineering, Architecture, and Contemporary Urbanism, Tehran, Iran. 5. Kamphuis, J., Davies, M., Nairn, R. and Sayao, O. (1986). "Calculation of littoral sand transport rate." Coastal Engineering 10(1), 1-21. [ DOI:10.1016/0378-3839(86)90036-0] 6. Kamphuis, J. W. (1991). "Alongshore sediment transport rate." Journal of Waterway, Port, Coastal, and Ocean Engineering 117(6), 624-640. [ DOI:10.1061/(ASCE)0733-950X(1991)117:6(624)] 7. Sadeghifar, T., Azarmsa, S. A. and Vafakhah, M. (2013). "Prediction of Alongshore Sediment Transport Rate Using Semi-Empirical Formulas and an Artificial Neural Networks (ANNs) model in Noor Coastal zone." Journal of Marine Engineering 9(17), 77-86. 8. Darama, Y., Selek, Z., Selek, B., Akgul, M. A. and Dagdeviren, M. (2019). "Determination of sediment deposition of Hasanlar Dam using bathymetric and remote sensing studies." Natural Hazards 97, 211-227. [ DOI:10.1007/s11069-019-03635-y] 9. Furnans, J. and Austin, B. (2008). "Hydrographic survey methods for determining reservoir volume." Environmental Modelling & Software 23(2), 139-146. [ DOI:10.1016/j.envsoft.2007.05.011] 10. Sadeghian, A., Yari, S. and Najafi Alamdari, M. (2016). "Analysis of Sedimentation Trends in Bushehr Port Access Channels Using Precise Hydrographic Data." Proceedings of the 2nd National Conference on Engineering and Information Technology, Iran. 11. Tajfirouz, B., Saeidi, V., Khalili, H. and Nemati, M. H. (2022). "Volume and Rate Estimations of Sedimentation in Amirabad Port During Period 2018-2021." Journal of Geoscience and Surveying Technology 11(3), 155-123. [ DOI:10.2478/jcbtp-2022-0028] 12. Autodesk. (2010). AutoCAD Civil 3D 2010 User's Guide. Autodesk Inc., San Rafael, CA. 13. Lee Rodgers, J. and Nicewander, W. A. (1988). "Thirteen ways to look at the correlation coefficient." The American Statistician 42(1), 59-66. [ DOI:10.2307/2685263]
|